Home / Timeline Stories / 2004–2010 — Infrastructure Upgrades 2004–2010 — Infrastructure Upgrades March 17, 2026 East-side fence along Dry Creek Drive constructed (2004) Rotating beacon added (2005) Cul-de-sac built (2005) Instrument approach becomes operational (2007)