2004–2010 — Infrastructure Upgrades

  • East-side fence along Dry Creek Drive constructed (2004)
  • Rotating beacon added (2005)
  • Cul-de-sac built (2005)
  • Instrument approach becomes operational (2007)

2004-2010 a

2004-2010 b

2004-2010 c

2004-2010 d